Connect the site, the drawings and the decisions

We build software to manage drawings, contractors and budget changes. We organise the workflow, connect the tools you already use and launch the first release.

Equipment classification and asset details
Related project · LENS Data Explorer

Engineering assets, connected records and revision history.

  • The approved drawing version
  • An owner for every action
  • Changes with a decision history

Project decisions from request to approval

A drawing revision, a site issue or a change order can affect schedule and budget. We map who submits, checks, approves and acts on each item, then connect the existing tools that carry the source information.

Where the process breaks down

  • Site teams and office teams use different drawing revisions.
  • Change requests move through email without a clear approval state.
  • Progress reports arrive after a decision has already been made.
  • Contractor records, documents and payments are difficult to connect.

How we approach it

  • We agree drawing identifiers, version rules and the people authorised to approve changes.
  • We link project records to BIM elements where the current tools expose the required data.
  • We record site evidence with its location, time and reviewer, including delayed synchronisation.
  • We keep proposed cost or schedule changes separate from approved revisions.

One possible first workflow

Example first release: a site issue from observation to acceptance

  1. Log an issue against a drawing
  2. Assign the contractor
  3. Submit completion evidence
  4. Accept or return the work

A site employee records an issue against a drawing version and assigns it to a contractor. The contractor submits completion evidence; the reviewer accepts the work or returns it with a reason.

Start with one site and one inspection workflow, retaining the document repository and accounting system. BIM authoring and quantity take-off are separate from this issue-management release.

Bring a sample issue, drawing-version rules, contractor roles and field connectivity constraints. The site owner confirms what evidence is needed to accept the work.

Review the assessment brief

What we build: site work tied to drawings, owners and approvals

Give site teams the approved information and give the office a record of changes, evidence and outstanding decisions.

BIM and project data

We link model elements to documents and tasks through available interfaces, keeping the project and version identifiers visible.

Schedule review

We compare the approved plan with reported progress and flag missing or conflicting updates for the project manager.

Site inspections

We capture observations, photos and follow-up tasks, with an assigned reviewer and a recorded closure decision.

Cost and change control

We track proposed changes, estimates and approvals, showing which revisions have been included in the current budget.

Contractor coordination

We give contractors access to their assigned work, required documents and open decisions, with permissions tied to the project.

Document control

We distinguish drafts, approved drawings and superseded versions, preserving the review history and links from site records.

Systems we connect: the drawing, the site update and the project record

Project plans

Identify the approved schedule, task codes and how revised plans reach site teams.

Document stores

Link to the source drawing and its version rather than maintaining uncontrolled file copies.

Contractor tools

Match company, project and assignment identifiers so each update reaches the responsible contractor.

Cost systems

Agree cost codes and the approval point at which a variation updates commitments or budget.

Field data

Define required evidence, device access and what happens when an update arrives after an offline period.

Reporting

Separate submitted progress, checked work and unresolved issues, with dates and source references.

Project evidence ready for review and handover

We agree document, inspection and handover requirements with your project and site owners. The software records the evidence and routes each decision to the people authorised to make it.

We agree the applicable requirements, owners and acceptance checks before implementation, based on your data, industry and operating countries.

Identity and access

Role permissions, MFA or SSO where required, access reviews and removal when responsibilities change.

Protection of sensitive data

Encryption in transit and at rest, controlled exports, agreed hosting locations and data-retention rules.

Audit and recovery

Relevant audit events, tested backups, vulnerability checks and named owners for incident response.

Document status and versions

Agree naming, approval states and version references so site records identify the drawing used for the work.

Handover documentation

Define required certificates, material records and completion evidence, with missing items assigned to an owner.

Inspection and correction

Link each observation to evidence, corrective work and a reviewer’s acceptance or reason for return.

Site access and responsibility

Define who may record, assign and close an issue, and which site events require immediate escalation.

Explore our security expertise

Choosing the site and office workflow to connect first

Start with the handoff between field teams, contractors and project controls that causes the most rework. Keep your existing document store and accounting system while connecting drawings, inspections and cost approvals.

Connect cost control, purchasing and change orders

Track budgets, contractor commitments, variation approvals and invoice handoffs in one operational system.

Explore custom ERP development

Build field inspection and contractor workspaces

Give site engineers, subcontractors and reviewers structured issue lists, drawing references and completion evidence.

Explore custom product development

Roll out across sites in controlled phases

Test the workflow on one active site, verify acceptance criteria with field teams and expand to additional projects once stable.

Prepare for a phased transition

Prepare a construction software brief

Bring a sample drawing revision, site issue and approval chain so the first release matches real site conditions.

Prepare a useful project brief
How do site teams handle poor connectivity on active projects?

We confirm offline capture and sync rules before design so delayed field submissions preserve their capture timestamp and photos without creating duplicate issues.

What happens to open issues when a drawing revision is published?

Each issue retains its original drawing revision link while showing the latest sheet version, so reviewers and contractors keep a clear audit trail.

Can subcontractors access only their assigned items?

Yes. External contractor accounts see only the sites, issues and evidence requests assigned to them, while internal staff control approval and closure.

Do we need to replace our existing document repository or accounting tool?

No. The first release typically connects to your retained document store and cost system rather than replacing both at once.

Tell us where project coordination breaks down

Bring one document or approval flow. We will map the people, tools and records needed for a first release.

Discuss construction software